CHR will be taking part in this event on the weekends of the 8/9th and 15/16th September. Operations as normal with the added attraction of the Oswestry South signal box open for visits.
The CHR website has the details on the front page, link on the right hand side of this page. The Signal Box event is on the national Heritage Open Days website and the event brochure will be available from outlets in the town including our museum. It is packed with special events over the next two weeks.
On Saturday evening 8th September at 7:30 pm Buffers will be projecting railway themed films, to include:
A Study in Steel
Train Time
Signal Engineers
Down to the Sea in Trucks
Rail Journey to the Sea
Our friends from Stonehouse Brewery will also have Cambrian Gold beer available.
All attractions subject to availability.
An informal blog about the work going on with the Cambrian Heritage Railways' (CHR) extension to Weston. This volunteer project aims to connect the existing running line to Weston Wharf where a station will be built. Copyright for the pictures remains with the original photographer
Thursday, 6 September 2018
Tuesday, 4 September 2018
It Will Be Pouring Soon
Work this week is concentrating on the area under the bridge to create a solid base and to anchor the two support trusses together. The area has been fenced off and the ground prepared for the piles that will anchor the slab firmly to the ground underneath.
Here you can see the mini piles under the base waiting to be then integrated in to the main slab which will be poured later.
These will provide the support for the track base, you can see where the rails will run on the way to Weston.
The previously completed steel piling has been propped to prevent any movement before the concrete is poured in to create the slab. There will also be form work and reinforcing to prepare here before the slab can be laid.
The work is proceeding in line with the revised plan, also with the CHR volunteers preparing sleepers for when we can gain access and continue with the push south.
Thanks again to Guy N for the pictures.
Until next time
Here you can see the mini piles under the base waiting to be then integrated in to the main slab which will be poured later.
These will provide the support for the track base, you can see where the rails will run on the way to Weston.
The previously completed steel piling has been propped to prevent any movement before the concrete is poured in to create the slab. There will also be form work and reinforcing to prepare here before the slab can be laid.
The work is proceeding in line with the revised plan, also with the CHR volunteers preparing sleepers for when we can gain access and continue with the push south.
Thanks again to Guy N for the pictures.
Until next time
Monday, 3 September 2018
That Has Capped It!
Confirmation and pictures that the cap has been completed over the sewer. A big 'phew' in one sense with less risk of a 'phew' in the other.
Guy's pictures show the cast and completed cap plus the covers on the approach. First an overall picture showing the cap and the work on the retaining walls.
The cap and related access point in place, looking back towards Oswestry station.
There are still some more gabions to be placed to support the cutting sides, now that the concrete has been completed this can be finished.
Looking towards Weston shows the approach to the sewer crossing and further along the completed earthworks on the cutting's sides
The part still to be completed is on the left
Work under the bridge is concentrated on stabilisation and piling works ready to support the track base. Thank to Guy N for the pictures.
Until next time
Guy's pictures show the cast and completed cap plus the covers on the approach. First an overall picture showing the cap and the work on the retaining walls.
The cap and related access point in place, looking back towards Oswestry station.
There are still some more gabions to be placed to support the cutting sides, now that the concrete has been completed this can be finished.
Looking towards Weston shows the approach to the sewer crossing and further along the completed earthworks on the cutting's sides
The part still to be completed is on the left
Work under the bridge is concentrated on stabilisation and piling works ready to support the track base. Thank to Guy N for the pictures.
Until next time
Sunday, 2 September 2018
Seeing Double
Here is the end result of the Thursday Gang's efforts on the crossing gates, after the first gate went on it was quickly followed by number two. Here Glynn's photo show the gates in position, the deliberate mistake will be corrected next time.
Now we have the two crossing gates that can be opened easily by hand. That is a lot easier than manually moving the Heras fencing for each and every operating session. The gates will be used in anger for the next operating session on the 15th September, why not come along and see progress on this and other parts of our project.
There are a lot of man hours invested in this project and it gives great satisfaction to see the end result. Take a bow all involved.
Until next time.
Now we have the two crossing gates that can be opened easily by hand. That is a lot easier than manually moving the Heras fencing for each and every operating session. The gates will be used in anger for the next operating session on the 15th September, why not come along and see progress on this and other parts of our project.
There are a lot of man hours invested in this project and it gives great satisfaction to see the end result. Take a bow all involved.
Until next time.
Friday, 31 August 2018
Thursday Gang
The Thursday Gang were out in force and strength. Whilst others were carrying on the usual tasks of coach restoration, site management, painting and gardening it took a strong crew, and steady hands, to mount the crossing gate to the now rigidly fixed gate post. Keeping the gate vertical, level and lifted up took a fair bit of coordination but finally the crew declared the job a success. Dave R took the photo from the conveniently placed steps of the signal box.
Work under the bridge continues and the likely completion date is late September. This is due to the additional investigation work and capping of the live gas main found under the bridge. This was not marked on any available drawings so required a solution to be identified, approved and actioned. The gas main is now well protected but the additional work delayed the construction of the retaining walls.
Every so often we also need to run works trains and Noel took some of a recent ballast working. Here is a sequence of photos starting with the train just having passed over the level crossing on which the gate above has just been installed.
The next view shows the train in front of the resplendent Oswestry South signal box.
Here the side-tipping Mermaid wagon has been loaded and is starting to move along the platform with the main Oswestry station building in the background, you can see just how long the platform is!
Although the signals are not yet operational there are some in place along the line, including the fixed distant to the south which is mounted up high for visibility. The view also shows the well-used path alongside the first part of the extension to Weston.
The classic view from in front of Oswestry station building shows the restored platform and signal, to the left are the remains of the down platform and the space between for the additional two tracks, these will eventually be relayed once we have enough funds in the bank, can you help?
Finally here is a short video taken in 1957 showing views along the railway, the rails are still in place in most of these locations and someday maybe we will see again an Ivatt 2-6-0 running in the country.
Thanks to all for the photos and hours put in on our project.
Until next time
Work under the bridge continues and the likely completion date is late September. This is due to the additional investigation work and capping of the live gas main found under the bridge. This was not marked on any available drawings so required a solution to be identified, approved and actioned. The gas main is now well protected but the additional work delayed the construction of the retaining walls.
Every so often we also need to run works trains and Noel took some of a recent ballast working. Here is a sequence of photos starting with the train just having passed over the level crossing on which the gate above has just been installed.
The next view shows the train in front of the resplendent Oswestry South signal box.
Here the side-tipping Mermaid wagon has been loaded and is starting to move along the platform with the main Oswestry station building in the background, you can see just how long the platform is!
Although the signals are not yet operational there are some in place along the line, including the fixed distant to the south which is mounted up high for visibility. The view also shows the well-used path alongside the first part of the extension to Weston.
The classic view from in front of Oswestry station building shows the restored platform and signal, to the left are the remains of the down platform and the space between for the additional two tracks, these will eventually be relayed once we have enough funds in the bank, can you help?
Finally here is a short video taken in 1957 showing views along the railway, the rails are still in place in most of these locations and someday maybe we will see again an Ivatt 2-6-0 running in the country.
Thanks to all for the photos and hours put in on our project.
Until next time
Tuesday, 28 August 2018
5 Stars
We always knew that with the Thursday Gang and other distinguished customers that 'Buffers' on Oswestry station was special. Now it is official, a recently arrived 5 star rating as recognition. No further excuses now for not joining in! Well done to Jenny and the Buffers team and go and sample their cakes.
On the ground there has been further progress by the contractors. There have been further supplies of materials, crushed stone for the sub base
and extra stones for filling the gabions
as well as extra reinforcement for the concrete pours.
Not forgetting the test cubes to make sure that everything is to specification. Test cubes are then subjected to extreme loads under a press to confirm their strength. After that these are disposed of, they do make excellent bases for garden sheds, so I am told.
The work continues around the bridge with the stabilisation of the re-profiled sides.
With the Bank Holiday it is a short working week.
Until next time
On the ground there has been further progress by the contractors. There have been further supplies of materials, crushed stone for the sub base
and extra stones for filling the gabions
as well as extra reinforcement for the concrete pours.
Not forgetting the test cubes to make sure that everything is to specification. Test cubes are then subjected to extreme loads under a press to confirm their strength. After that these are disposed of, they do make excellent bases for garden sheds, so I am told.
The work continues around the bridge with the stabilisation of the re-profiled sides.
Meanwhile under the bridge the inspection and rectification work to the steel and brickwork continues.
The last of Guy's pictures shows an obstacle on the line. "You can't park that there, they'll be a train along soon."
Until next time
Saturday, 25 August 2018
100 Not Out
It's not the score from the latest test match but On The Weston Front has arrived at the grand old age of 100 blog posts. It's taken just under a year which means an average of around two posts per week, though there have been some lean periods where external events have meant posts have been spaced much further apart.
I hope that you have enjoyed the journey so far and will continue to look in to see progress on our project.
None of this would have been possible without the support of fellow CHR members who continue to give up their time to volunteer working on the railway. Special thanks must be given to the roving reporters who provide the photographs and details of the work.
What will the next 100 posts bring?
Well we all hope that the progress that has been made so far will continue and we reach our goal of rails to Weston. Though this blog looks mainly at the push to Weston there is much going on at other sites, in particular Llynclys where the dedicated crew continue with the restoration of rolling stock and the operation of the services to Penygarreg Lane.
I hope to carry on with the blog posts from wherever in the world I happen to be, posts have been made from many strange places and at strange hours, many thousands of miles away from Oswestry but always with my heart and mind concentrated on events back in the top left hand corner of Shropshire.
We look forward to hearing from or seeing you.
Thank you for reading this and the continued support.
See you in the second century
I hope that you have enjoyed the journey so far and will continue to look in to see progress on our project.
None of this would have been possible without the support of fellow CHR members who continue to give up their time to volunteer working on the railway. Special thanks must be given to the roving reporters who provide the photographs and details of the work.
What will the next 100 posts bring?
Well we all hope that the progress that has been made so far will continue and we reach our goal of rails to Weston. Though this blog looks mainly at the push to Weston there is much going on at other sites, in particular Llynclys where the dedicated crew continue with the restoration of rolling stock and the operation of the services to Penygarreg Lane.
I hope to carry on with the blog posts from wherever in the world I happen to be, posts have been made from many strange places and at strange hours, many thousands of miles away from Oswestry but always with my heart and mind concentrated on events back in the top left hand corner of Shropshire.
The CHR project will continue to flourish, our progress is only limited by funding and man hours so please see if you can help.
- You could join the CHR organisation and receive the journal amongst other benefits. The latest one has just been published containing more details on the project and background information.
- Why not join in as a working volunteer? CHR working days and times are a mixture, from those who have time during the week, to weekend work and then those who can only spare and odd hour or two in the evening. We are all volunteers and there is work for all levels of ability or speciality from the dirty side to paperwork.
- You can make donations to CHR on line using the link in the top right of the page.
- Or come along and take a ride or attend a special event. Come and see how we are progressing and how much more there is to do.
- Spread the word about CHR and the project, share the posts or links to your contacts.
We look forward to hearing from or seeing you.
Thank you for reading this and the continued support.
See you in the second century
Subscribe to:
Posts (Atom)

















