Wednesday, 30 October 2019

Dates For Your Diary

In addition to the usual timetable we are already planning some special events for 2020 so here are the dates to put in you diary. We would love to see you.

30th 31st May. Model Railway Exhibition.

11th 12th July Oswestry Food and Drink Festival.

11th to 20th September. Heritage Open Days. Note trains run at weekends but the museum will be open all week.

31st October. Ghost Train.

7th 8th December. Santa Special

14th 15th December. Santa Special

21st 22nd December. Santa Special

Other events will be added during the year so keep a lookout for updates.

Until next time.

Friday, 25 October 2019

Wednesday, 23 October 2019

Weston Station Progress

The CHR Facebook page has been updated with some progress photos from Weston.

For those without access to Facebook I am reposting them here.

We start looking across from the loading dock towards what will be the platform.

The loading dock will be home to rolling stock to assist with station facilities.
Looking along the loading dock from the stop block.
Now we are looking along the wall at track level of the two sidings.
Ballasting of the sidings is underway.
The office in the goods shed is being made ready for use as part of the facilities and will house displays about the history of the site and railway.

Many thanks to CHR Facebook for the pictures.

Until next time.

Tuesday, 22 October 2019

Team Tuesday

Team Tuesday had a varied day, working on fencing, logistics and horticulture.  

The site boundaries needed extending and remaking so it was back to the Cambrian Shuffle as panels were moved around and anchored in their new positions.

Norman was on hand with his camera to take a couple of pictures.

We start by sizing up the job to determine where the new fence will go. Then it was moving and shifting time.



The horticultural bit? Well one of the items on the list was to remove a tree that had grown up over the last thirty or so years. It took a bit of planning but as the picture shows we had the 'tree fellas' on hand ready to go.

Thanks to the volunteers and to photographer Norman K.

Until next time.

Monday, 21 October 2019

Llynclys Clearance, Second Weekend

Over the weekend attention was focused on Llynclys to remove excess vegetation and move stock around for better access.

Norman K lead the clearance team along with Mrs K, Miss B and Colin giving valuable assistance to push back a year of growth. Many thanks for performing this task. 

As Norman was pretty busy with the tools Guy took some pictures.  We start with Norman in mid strim taking down the level of scrub hoping to find a long lost Ivatt 2MT.

We did not find the loco but we did uncover future restoration projects for the C&W team.  You can see the saplings that have grown up since the last time this area was cleared.
A theme throughout the day was the level of standing water. Recent rainfall still needs to soak away.
The team continued with cutting back the brambles.
The piles kept growing during the day and will be dried out and burnt later on.
Colin indicates how high up the brambles have grown along the hedgeline.
And then gets stuck in gathering up what has already been cut.
The mounds kept growing during the day.
The weather mostly held during the day allowing good progress to be made.
Although the conditions under foot made you glad to have remembered to wear wellies.


In the yard the loco Alun Evans was out on shunting duty to move stock around for ease of access and future restoration.
Rob and John were the crew.
Thanks to all who participated with the work at Llynclys. Norman thinks that another session will be needed to finish off so keep watching.

Until next time.

Saturday, 19 October 2019

Black Meadow Crossing Update

Although not yet finished we would like to share with you the progress on the restoration of the crossing by the CHR volunteers.

Guy and his camera have been out again to record the latest progress.  However we start this photographic journey in December 2016 with the lifting of the weed-ridden track.  


Since then many hundreds of hours have been spent by our volunteers working first on clearing the trackbed, preparing the sub base/materials, replacing the track and then ballasting. Not forgetting the installation of all of the drainage system.

Here is the view from the same location on Saturday. Quite a change.



We will now have have a  tour of the crossing, the  latest photos start with a view of the newly installed access gate.
Here is the gate from the far side of the crossing.
The fencing to the right has also been added.  The site fencing is to prevent people from straying on to the construction site.
Looking along the line to Weston you can just see the current limit of operation on the running line.
The crossing is now in place allowing our neighbour to access their fields. We are very grateful to our neighbours for the support they gave during the rebuilding.
The crossing now has warning signs which now mean something.  It had been a while since trains had run along this section.
The limit of operations will gradually be extended down to the cattle creep, possibly by the time of the Santa services.  The limiting factor is the number of volunteer hours.  If you fancy lending a hand come along and see what we are doing and talk to the team.

Thanks to Guy for the pictures.

Until next time

Forgotten Thursday

Another job ticked off at Black Meadow Crossing was the installation of an access gate. This was done by the Thursday Gang but everyone was so busy that they forgot to take a picture before moving to the next job. Later Guy took a picture of the gate now in the correct position.

There are still jobs to finish off but the list is getting shorter. 

Until next time.