Thanks to Andy here is an image from Weston twelve months ago. Many strange and unforseen things have happened in the last year but the progress at Weston has been remarkable.
Until next time.
An informal blog about the work going on with the Cambrian Heritage Railways' (CHR) extension to Weston. This volunteer project aims to connect the existing running line to Weston Wharf where a station will be built. Copyright for the pictures remains with the original photographer
Thanks to Andy here is an image from Weston twelve months ago. Many strange and unforseen things have happened in the last year but the progress at Weston has been remarkable.
Until next time.
The weather on Thursday was a little damp but the enthusiasm was still there. Most of the work was related to preparing for next week when there will be a working week to tackle some significant projects
Andy G's camera captured a few goings on during the day.
Down at the river bridge the wire fencing was being installed. Just look at how clear the site is now following attention by Dave, Nick and Norman under the heavy rain.
There has been impressive progress over the last year inspite of the difficulties. Long may this continue.
Thanks to all who braved the weather and to Andy for the soggy pictures.
Until next time.
The Tuesday Team were back in action at Weston and Andy G took the following pictures and sent the following report. Thanks Andy.
Today the last rails were cut to size and fitted to join the Up-line to point 3. This was the last bit of rail required in the Weston project. The rails were clipped into place and the fishplates were fitted to the rails that have been drilled. Point 3 still needs gauging, the last rail chairs screwed down and guide rails fitted. The 2 ironman were walked down from Oswestry and then used to move unused rail sections from the top of the Weston site down to near point 3. A start was made on concreting in the ground frame that will be used to operate point 1,2 and the catch point. Also previously dropped ballast was distributed on the down line and at the end of the day there were train movements to drop more ballast from the Dogfish which had been filled in the morning rain.
The first view shows the team working along the line moving the ballast manually into position.
The rails to connect the point have been cut to length. You can see clips still need to be installed once the alignment is confirmed.Until next time.
One of the next stages is to ballast the track in the station. For this we use many tonnes of crushed stone or ballast. The stones with sharp edges lock together to hold the sleepers in place.
With plenty of ballast to place on position a lot of thought has gone in to speeding up the process.
In this picture from CHR Facebook you can see two loaded ballast hoppers on their way to the station to drop their load on the track.
There are plenty more loads to be dropped on the track before we can call the track ballasted. Then we have the fun of jacking and packing to the final alignment.
Keep looking out for more progress updates
Until next time.
Over the weekend there was further progress on the point at the southern end of the run round loop by a small party of volunteers.
Here is a picture of the work thanks to CHR Facebook. You can find our pages through the link in the top right of this page. If you do visit don't forget to leave a like.
There was also a series of ballast drops on the platform road and loop line.
Elsewhere work continued on key projects at Oswestry and Lynclys. We shall have to see how the Welsh lockdown will affect the situation.
Until next time.
The volunteers were hard at work on various jobs around the site with Andy G taking photos during the day.
In preparation for ballasting the Dogfish wagons were loaded with fresh ballast. This makes such a change from the previous methods of moving the ballast manually.
It was a case of digging deep by Glyn on Tuesday. Four large and heavy gateposts were sunk into the ground, each to a depth of three feet. That's a lot of digging!
The purpose of the posts is to hang the gates at the crossing of the footpath just to the north of the river bridge.
Andy G was on hand to take pictures during the day and we start off with a clear view south from the bridge showing how much vegetation Norman and helpers have cleared. The area beyond the bridge is now visible as is the level crossing on the main road.