As mentioned previously we have been preparing for the operating season and putting our house in order.  This includes tidying up and cutting back the vegetation before we go in to the nesting season when it is no longer possible to disturb hedgerows.  Colin sent a picture of the area to the north of the crossing alongside the Cambrian Railways works where the team spent some time on clearance work.  The pictures shows the point at the north end of the run round loop,

Afterwards the team went to the crossing of the A483 to continue lineside clearance. The air was quite cold and there was a strong wind, snow was also in evidence but the dedicated team continued until the lure of tea intervened.  Thanks to Colin for the picture and for the team for braving the arctic conditions.

The second newsletter has been published and there are more details about future plans including the relaying of the centre road on Oswestry.  Have you signed up yet?  You can sign up on the CHR website. link on the right hand side of this page.

Until next time.


No comments:

Post a Comment