In parallel with work on the coaches some of the other vital rolling stock is being updated for further service. First up is the Lowmac which, along with a good de-rust and paint, is having a new deck installed. This ongoing job when finished will allow us to take plant and machinery along the line to where it is needed. The 'Dogfish' ballast wagon behind is having some attention to the brakes.
The second view shows the box van which with it's fresh coat of paint was having some work done on the piping.
Thanks to CHR Facebook for the pictures.
No comments:
Post a Comment