Getting The Water Away

Although not such a headline activity as tracklaying we have multiple projects going on around Oswestry station to return the surroundings to an operating condition.  With all of the rain that has fallen it is important to keep on top of drain maintenance.  Recently some volunteers have been continuing with the clearing and overhaul of the drainage system between the platforms.

The drains had become full of all sorts of debris and growth from years of not being maintained.  The first picture is a recently refurbished catch pit before the cover was put back.  Looking at the picture does not really show how much work is involved but the team are rightly proud that there is a pleasant sound of running water after it rains as the drains to their job. Like many items we restore only the surface is visible with 90% of the work unseen beneath.

 Once cleaned out and made functional the cover is replaced
 Here is a work in progress as we work our way along the centre road. 
There are still more drains to clear along the centre road and also equipment that needs to be relocated.  In the following picture, in the background, the platform wall can be seen waiting it's turn for renovation.  The foreground shows panel number thirteen being assembled.
Thanks to Guy for the pictures

Until next time.