After loosening the clips the first rail is pulled from the bridge deck.
Closely followed by the second rail.
Next it was the turn of the longitudinal baulks of timber to be pulled out.
With both timbers now removed the bridge and track fixings can be inspected.
The team looking pleased with the work so far.
The last job was to make the site secure and erect fencing.
Many thanks to all who helped and to Andy G for the pictures.
Until next time.
No comments:
Post a Comment