Monday, 7 October 2019

Suburban Coach Update

Over the weekend Reg and the team prepared and sprayed the area between doors 4 and 5.

As those of you who have ever repaired bodywork will know preparation is 95 percent of the battle.  The repairs have been completed and the surfaces prepared.

We start with a look the the coach side just before spraying. You can see how much of the lower body sides have been replaced. Reg and the team have been busy.

The next photo shows the windows masked and the previously painted bays are protected from overspray.
The first coat is on and the next panels move closer to completion.
The temporary spray booth allows us to keep the dust at bay. But don't go near with dusty or dirty clothes!
With the outside done the inner door panel can be replaced, look at the finish! Well done to John and the varnishing crew.
The coach continues to make progress thanks to the volunteers. It will be a beauty when finished.

Thanks to Guy for the pictures.

Until next time.

No comments:

Post a Comment