The CHR Facebook page has been updated with some progress photos from Weston.
For those without access to Facebook I am reposting them here.
We start looking across from the loading dock towards what will be the platform.
The loading dock will be home to rolling stock to assist with station facilities.
Looking along the loading dock from the stop block.
Now we are looking along the wall at track level of the two sidings.
Ballasting of the sidings is underway.
The office in the goods shed is being made ready for use as part of the facilities and will house displays about the history of the site and railway.
Many thanks to CHR Facebook for the pictures.
Until next time.
No comments:
Post a Comment