Sunday 8 July 2018

Another Day, Another Bridge

Not content with one bridge under repair, we now have two.  Member Guy N took a walk round the works and sent in these photos, thanks Guy. As the sign says the work will be complete within July.  This is the metal footbridge that runs alongside the brick over bridge on Middleton Road.
 The footbridge has been fenced off and already both ends have been disconnected from the footpath.

Under the bridge the ballast pad for the crane has been positioned and the lift should take place next weekend,
 A look back towards Oswestry shows the footbridge waiting for the crane.
Work continues around the various sites under the sunshine.  For those who want to join in for the Big Working Weekend of the 14th/15th July there should still be time to allow you to get home and watch the football match.  Though it's still to be decided when England will be playing.  That decision is not under our control but good luck to the England Team.

Until next time

No comments:

Post a Comment