Tuesday 28 May 2019

Squeezing One In

One of the leftover jobs from the work under Gasworks Bridge was to install an additional concrete sleeper to the south to support the rails.  The team tackled this job and Guy was on hand to take a picture once completed.   This meant a bit of a shuffle with the sleepers and an inverse game of Mikado (the one where you have to remove sticks without moving the rest) as the sleeper has to be threaded under the rail without causing disruption.  Just to add to the fun access from the sides is limited by the steps and supporting wall.

It was a bit of a wiggle but in the end, as you can see in the picture, the sleeper is in and the rail clips are now evenly spaced, ready for trains.
There is still plenty to do with preparing the track for passenger services.  The line needs to be finally packed and tamped but the way ahead is now clear.
Thanks to Guy for the pictures.

Until next time

No comments:

Post a Comment