Friday 13 November 2020

Weston

We had a working period which was due to run the whole week but instead was cut short due to the lockdown. There was still plenty going on during the week and a great many jobs were tackled. Andy G was on hand with his camera to capture what was going on.  Here are a couple of pictures from just before lockdown started of the point being hand ballasted after the final chairs had been bolted down.

In the first picture we are looking south towards the river.



In the second picture we are looking from the River bridge back towards the station with the chairs on the bridge deck being bolted down.


More pictures from the working week will be uploaded in the following days.

Until next time.

No comments:

Post a Comment