Along with the main yard gates the smaller car park access gates were given a makeover as well.
Work continued on the next one of the main crossing gates, these need to be cleaned down and primed before the top coats are applied.
Other jobs undertaken were checking the recently arrived cabin, the roof is sound and so far leak-free. An extra floor panel was procured ready to install. The Barclay was sheeted over for winter
Another delivery of 400 sleepers (concrete this time) arrived for the extension and the team made a stocktake of material on hand.
Thanks to Dave R for the information and to Guy N for the pictures.
Another delivery of 400 sleepers (concrete this time) arrived for the extension and the team made a stocktake of material on hand.
Thanks to Dave R for the information and to Guy N for the pictures.
Until next time.