Monday, 20 August 2018

The Cap Fits

Guy took a walk along the site over the weekend and has provided photographs of recent progress around the sewer.

Since the previous photographs additional form work has appeared and already some extra parts of the slab have been cast.  This is to create a complete cover over the sewer.  Here is the form work ready to receive the concrete.

 Before the concrete is poured there are still a few points to complete and gaps to fill.  In this view you can see the thickness of the slab.


 Here is the slab on the previously completed footings.
 The other end of the slab also has extra form work installed.

 With the whole slab assmbly waiting for the next concrete pour.
Work has carried on alongside on the drainage system and here is the view looking South with Gasworks Bridge in the distance.


The drain can be seen on the right, feeding in to an inspection chamber, once completed all this work we be below track level and no longer visible.


As you can see work is progressing well but there will be a slight delay as extra work was needed on a gas main which was discovered during the excavation.  Meanwhile the P.Way gang have been limbering up and flexing their muscles ready for tracklaying.

Until next time

No comments:

Post a Comment